Skip to content
M&N Home DesignDESIGN  ·  STRUCTURAL  ·  CIVIL

Additions & remodels

Every remodel has a point where continuing to keep the old structure costs more than replacing it. Finding that point early — before drawings, before a builder walks the job — is most of the value.

Additions & remodels by M&N Home Design

What is involved in a home addition or remodel?

An addition or remodel adds to or reworks an existing house, which means the design has to reckon with what is already there: the existing foundation, the existing framing, and what the current code now requires of it. The structural assessment usually decides how far the project can sensibly go.

What you get

Existing conditions
Measured survey of what is actually there, not what the old plans say.
Structural assessment
What the existing foundation and framing can carry, and what must change.
Design
A plan that reads as one house rather than an old one with a box on the side.
Permit set
Drawings, structural package and Title 24 for the altered scope.
SERVICE ADDITIONS &REMODELS 4 DELIVERABLES WHAT YOU RECEIVE 01 Existing conditions 02 Structural assessment 03 Design 04 Permit set M&N HOME DESIGN LOS ANGELES & VENTURA COUNTY

Questions we get asked

Does a second-storey addition need a new foundation?
Often the existing foundation needs strengthening rather than full replacement, but that can only be determined from what is actually there — the footing dimensions, the reinforcement, and the soil. A structural assessment early in the project is what stops this becoming a mid-construction surprise.
Will a remodel trigger upgrades to the rest of the house?
Sometimes. Depending on the scope, a permit can trigger requirements such as energy upgrades, smoke and carbon monoxide alarms, or seismic strengthening. Scoping this at the start lets you decide the extent of the project deliberately rather than discovering it in plan check.

Guides on this

Where we provide this service

Send us the address.

Tell us the property and roughly what you want to build. We come back with what the zoning allows, the likely permit path, and a fixed fee for the first phase.